Skip to main content

Checkpoint: The Integrated Tracker

intermediate15 min readLesson 120 of 180

Graded checkpoint: the full three-layer expense tracker — validation, upsert, aggregation, and deterministic tie-breaks.

Checkpoint — the integrated system

The full expense tracker, assembled. Failing this checkpoint means one of the milestone contracts broke under integration — the tests will name it.